    Power Industry SOLUTIONS

    Application in petrochemical industry

    Application of Kaiyan machinery inPower Industry

    According to the "five prevention" specifications and technical requirements of electric power, the mechanical interlocking system is designed and equipped with electric five prevention mechanical lock. Each step of operation can be realized through key transmission to ensure that the electric equipment operates according to the preset safety procedures. The product is made of stainless steel without spring marbles. The lock cylinder key can ensure 1 million rotation and insertion operations. It is a safe mechanical interlocking product certified by CE.

    It has been widely used in Huaneng, Datang, Huadian, Guodian and CPI power generation groups and nuclear power plants.
    KAIYAN MACHINERY
    Power five prevention system (FTS)

    Power five prevention system is used for bus grounding maintenance

    Auxiliary power 10kV / 6kV bus maintenance interlocking will form interlocking between incoming cabinet, liaison cabinet, transformer feeder cabinet and bus grounding knife

    Only after the incoming cabinet, liaison cabinet and transformer feeder cabinet are disconnected, the key can be released from the exchange box to unlock the bus ground knife lock, so as to ensure the safety of maintenance personnel.

    Interlocking application of electric power five prevention system in electrostatic precipitator

    If you directly enter the manhole door of the electrostatic precipitator room without disconnecting the 400V power switch or grounding discharge, there will be a risk of entering the charged interval by mistake. If a set of mechanical interlocking is installed on the 400V switch, rectifier transformer ground knife and manhole door according to the normative logic, the problem of entering the charged interval by mistake in the electrostatic precipitator room can be well solved.

    Description of interlocking scheme:

    1. When each 400V high-frequency power switch is operated to the power-off position, the keys A1, A2, A3 and A4 in each latch lock can be pulled out, and the locking switch is in the power-off position;

    2. Insert the keys Al, A2, A3 and A4 into each grounding switch to unlock the grounding knife. When operating the grounding knife to the closing position, turn all keys B on BL2 lock to lock the grounding knife in the closing position;

    3. Use the keys BL, B3, B5 and 87 to open the doors of each knife switch box and start the maintenance work;

    4. When it is necessary to enter the dust collector for maintenance, insert all keys 82, 84, 86 and B8 into the exchange box, exchange key C, and then open the manhole door to start maintenance.

    Interlocking application of power five prevention system in insulation test

    Many power plants are equipped with 6kV switchgear, including center mounted or floor mounted trolley switches (removable). The power inspection and insulation measurement after equipment maintenance and before power transmission bring many dangers and inconveniences to operators, and there are many potential safety hazards.

    Description of interlocking scheme:

    1. Pull the 6kV circuit breaker to the test position, rotate and pull out the key a on the pile lock, and the 6kV circuit breaker will be locked in the test position.

    2. Use key a to open the door lock on the 6kV insulation measuring small door for insulation measuring operation.

    3. Only when the 6kV insulation door is closed can key a be pulled out and unlocked to the 6kV circuit breaker to restore power transmission

    Interlocking application of power five prevention system in maintenance of dry type transformer

    When the dry-type transformer is overhauled, if the high and low voltage side switches of the dry-type transformer are not disconnected, it will be very easy to enter the live interval by mistake. This potential safety hazard can be well solved by mechanical interlocking.

    Description of interlocking scheme:

    1. Disconnect the 400V circuit breaker, pull it to the test position, rotate and pull out the key C1 of the mechanical lock on the 400V circuit breaker, and the 400V circuit breaker will be locked in the disconnected state.

    2. Disconnect the 6kV circuit breaker, pull it to the test position, rotate and pull out the key C2 of the mechanical lock on the 6kV circuit breaker, and the 6kV circuit breaker will be locked in the disconnected state.

    3. Insert the above C1 and C2 keys into the two for two key exchange box to exchange the keys C3 and C4.
    應用案例

    Mechanical five proof lock

    探索更多

    Mechanical program lock

    探索更多

    Mechanical key interlock

    探索更多

    Safety mechanical interlock

    探索更多

    Mechanical anti misoperation locking

    探索更多

    国内精品久久久久久野外| 夜夜精品视频一区二区| 国产精品99久久久久久董美香| 久久精品www人人爽人人| 精品亚洲一区二区三区在线播放| 2020久久精品亚洲热综合一本| 亚洲精品午夜无码电影网| 国产精品好好热在线观看| 91精品国产麻豆国产自产在线| 国产啪精品视频网站| 国产成人麻豆精品午夜福利在线 | 午夜成人精品福利网站在线观看| 2019天堂精品视频在线观看 | 精品露脸国产偷人在视频| 色综合91久久精品中文字幕| 91麻豆精品激情在线观看最新| 亚洲中文字幕久久精品无码APP| 国产精品成人自拍| 亚洲精品人成网线在线播放va| 少妇人妻无码精品视频app| 伊人久久精品午夜| 国产精品亚洲综合专区片高清久久久| 久久久久人妻精品一区三寸| 精品久久久久久亚洲精品| 久久亚洲伊人中字综合精品| 久久夜色精品国产www| 日本免费精品一区二区三区| 日韩精品一区二区三区毛片 | 亚洲麻豆精品国偷自产在线91| 精品国产这么小也不放过| 亚洲国产成人久久99精品| 特级精品毛片免费观看| 亚洲欧洲美洲无码精品VA| 久久99亚洲综合精品首页| 国产a不卡片精品免费观看| 日韩在线视精品在亚洲| 日韩精品视频观看| 99久久免费精品国产72精品九九| 亚洲AV无码一区二区三区久久精品| 国产精品久久久久久久久 | 久久精品这里只有精99品|