    Power Industry SOLUTIONS

    Application in petrochemical industry

    Application of Kaiyan machinery inPower Industry

    According to the "five prevention" specifications and technical requirements of electric power, the mechanical interlocking system is designed and equipped with electric five prevention mechanical lock. Each step of operation can be realized through key transmission to ensure that the electric equipment operates according to the preset safety procedures. The product is made of stainless steel without spring marbles. The lock cylinder key can ensure 1 million rotation and insertion operations. It is a safe mechanical interlocking product certified by CE.

    It has been widely used in Huaneng, Datang, Huadian, Guodian and CPI power generation groups and nuclear power plants.
    KAIYAN MACHINERY
    Power five prevention system (FTS)

    Power five prevention system is used for bus grounding maintenance

    Auxiliary power 10kV / 6kV bus maintenance interlocking will form interlocking between incoming cabinet, liaison cabinet, transformer feeder cabinet and bus grounding knife

    Only after the incoming cabinet, liaison cabinet and transformer feeder cabinet are disconnected, the key can be released from the exchange box to unlock the bus ground knife lock, so as to ensure the safety of maintenance personnel.

    Interlocking application of electric power five prevention system in electrostatic precipitator

    If you directly enter the manhole door of the electrostatic precipitator room without disconnecting the 400V power switch or grounding discharge, there will be a risk of entering the charged interval by mistake. If a set of mechanical interlocking is installed on the 400V switch, rectifier transformer ground knife and manhole door according to the normative logic, the problem of entering the charged interval by mistake in the electrostatic precipitator room can be well solved.

    Description of interlocking scheme:

    1. When each 400V high-frequency power switch is operated to the power-off position, the keys A1, A2, A3 and A4 in each latch lock can be pulled out, and the locking switch is in the power-off position;

    2. Insert the keys Al, A2, A3 and A4 into each grounding switch to unlock the grounding knife. When operating the grounding knife to the closing position, turn all keys B on BL2 lock to lock the grounding knife in the closing position;

    3. Use the keys BL, B3, B5 and 87 to open the doors of each knife switch box and start the maintenance work;

    4. When it is necessary to enter the dust collector for maintenance, insert all keys 82, 84, 86 and B8 into the exchange box, exchange key C, and then open the manhole door to start maintenance.

    Interlocking application of power five prevention system in insulation test

    Many power plants are equipped with 6kV switchgear, including center mounted or floor mounted trolley switches (removable). The power inspection and insulation measurement after equipment maintenance and before power transmission bring many dangers and inconveniences to operators, and there are many potential safety hazards.

    Description of interlocking scheme:

    1. Pull the 6kV circuit breaker to the test position, rotate and pull out the key a on the pile lock, and the 6kV circuit breaker will be locked in the test position.

    2. Use key a to open the door lock on the 6kV insulation measuring small door for insulation measuring operation.

    3. Only when the 6kV insulation door is closed can key a be pulled out and unlocked to the 6kV circuit breaker to restore power transmission

    Interlocking application of power five prevention system in maintenance of dry type transformer

    When the dry-type transformer is overhauled, if the high and low voltage side switches of the dry-type transformer are not disconnected, it will be very easy to enter the live interval by mistake. This potential safety hazard can be well solved by mechanical interlocking.

    Description of interlocking scheme:

    1. Disconnect the 400V circuit breaker, pull it to the test position, rotate and pull out the key C1 of the mechanical lock on the 400V circuit breaker, and the 400V circuit breaker will be locked in the disconnected state.

    2. Disconnect the 6kV circuit breaker, pull it to the test position, rotate and pull out the key C2 of the mechanical lock on the 6kV circuit breaker, and the 6kV circuit breaker will be locked in the disconnected state.

    3. Insert the above C1 and C2 keys into the two for two key exchange box to exchange the keys C3 and C4.
    應用案例

    Mechanical five proof lock

    探索更多

    Mechanical program lock

    探索更多

    Mechanical key interlock

    探索更多

    Safety mechanical interlock

    探索更多

    Mechanical anti misoperation locking

    探索更多

    久久亚洲AV无码精品色午夜 | 亚洲精品乱码久久久久66| 亚洲国产精品成人久久久| 久久人搡人人玩人妻精品首页 | 中文国产成人精品少久久 | 久久精品国产久精国产思思| 国产精品亚洲美女久久久| 国产精品99亚发布| 99国产精品视频久久久久| 久久久久人妻一区精品| 国产精品无码专区在线播放| 国产精品视频网站| 久久久国产精品无码免费专区| 亚洲精品乱码久久久久久蜜桃| www好男人精品视频在线观看| 久久精品桃花综合| 日韩精品一区二区三区色欲AV| 2020年国产精品| 久久久久久精品成人免费图片 | 国产精品jvid在线观看| 狠狠色香婷婷久久亚洲精品| 夜色www国产精品资源站| 日韩精品无码免费专区午夜| 久久福利资源国产精品999| 人人妻人人澡人人爽人人精品 | 国产最新进精品视频| 亚洲国产精品日韩| 国产精品入口麻豆完整版| 四虎国产精品永久在线无码| 精品国产一区AV天美传媒| 日韩精品无码一区二区中文字幕 | 51视频国产精品一区二区| 精品无码人妻一区二区三区| 国产精品成人小电影在线观看| 国产女人乱人伦精品一区二区| 亚洲av永久无码精品网址| www.精品国产| 国产精品一级香蕉一区| 国产92成人精品视频免费| 精品久久久无码人妻中文字幕| 91精品国产肉丝高跟在线|